EPC模式下市政工程固定总价合同风险及防范策略研究 被引量:11

Research on Risks and Prevention Strategies of Fixed-price Contracts of Municipal Engineering under EPC Model
在线阅读 下载PDF
导出
摘要 EPC模式下常采用固定总价合同形式,与传统平行发包模式相比,总承包商将面临更大的项目管理风险。探讨分析市政工程中固定总价合同常见的风险因素,并根据不同的风险因素给出相应的防范策略,避免总承包商产生不必要的经济纠纷及损失。 A fixed-price contract form is often used in the EPC model.Compared with the traditional Design-Bid-Build model,the general contractor faces greater project management risks.This paper discusses and analyzes the common risk factors of fixed-price contracts in municipal engineering,and provides corresponding prevention strategies based on the risk factors,which aims to avoid unnecessary economic disputes and losses.
作者 胡万勇 江新卫 HU Wanyong;JIANG Xinwei(Central and Southern China Municipal Engineering Design&Research Institute Co.,Ltd,WuHan 430010,China)
出处 《工程经济》 2020年第6期46-48,共3页 ENGINEERING ECONOMY
关键词 EPC模式 固定总价合同 风险因素 策略 EPC model fixed-price contracts risk factors strategies
  • 相关文献

同被引文献45

引证文献11

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部