期刊文献+

北京地铁13号线闸机改造方案研究

Study on Reconstruction Scheme of Gate of Beijing Metro Line 13
在线阅读 下载PDF
导出
摘要 北京地铁票改二期工程中,地铁13号线的闸机因设备老旧,与现有大部分模块接口不兼容,无法实现新的路网统一读写器功能,因此需要进行整体改造。通过研究原有闸机、勘察现场闸机阵列布局及分析改造难点,提出符合票改二期工程自动售检票系统技术要求的闸机改造方案,并介绍了改造后闸机的设计特点以及改造中的难点及解决方案。 In the second phase of the Beijing Metro ticket reform project,the gates of Metro Line 13 were outdated and incompatible with most of the existing module interfaces.The new road network unified reader writer function could not be realized,so an overall transformation was needed.By studying the original gates,surveying the layout of gate arrays on site and analyzing the difficulties of reconstruction,a gate reformation plan that meets the technical requirements of the automatic ticketing system for the second phase of the ticket reform project was proposed.It also introduces the design features of the gate after the transformation,as well as the difficulties and solutions in the transformation.
作者 王帅 WANG Shuai(BeiJing Metro Technology Development Co.,Ltd.,Beijing 100072,China)
出处 《机械工程与自动化》 2020年第3期199-202,共4页 Mechanical Engineering & Automation
关键词 地铁 闸机 改造 metro gate reconstruction
  • 相关文献

参考文献7

二级参考文献17

  • 1邓先平,陈凤敏.我国城市轨道交通AFC系统的现状及发展[J].都市快轨交通,2005,18(3):18-21. 被引量:72
  • 2于梅.机械设计中的模块化设计思想[J].科技资讯,2006,4(2):24-25. 被引量:9
  • 3罗慧,洪澜.广州市轨道交通自动售检票系统现场设备数量的确定[J].城市轨道交通研究,2006,9(7):55-57. 被引量:8
  • 4[2]叶霞飞.城市轨道交通规划与设计[M].北京:中国铁道出版社,2004
  • 5[2]吴文麒.轨道交通运行控制与管理[M].上海:同济大学出版社,2004.
  • 6[5]徐安.城市轨道交通电力牵引[M].北京:中国铁道出版社,2004.
  • 7北京城建设计研究总院.地铁设计规范(GB50157-2003)[S].北京:中国计划出版社,2003.
  • 8广州市地下铁道设计研究院.广州市轨道交通一号线票务系统改造工程可行性研究报告[R].广州:广州市地下铁道设计研究院,2008.
  • 9广州市地下铁道设计研究院.广州市轨道交通二号线票务系统改造工程可行性研究报告[R].广州:广州市地下铁道设计研究院,2008.
  • 10城市建设研究院.城市轨道交通自动售检票系统技术条件(GB/T20907-2007)[s].北京:中国标准出版社,2007.

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部