摘要
广州地铁一号线和原二号线(三元里-江南西、晓港-琶洲)自动售检票系统(AFC)从投入运营至今已经约十年时间,部分车站终端设备配置已无法满足日益增长的客流需要,从运营实际出发,对AFC系统改造工程案例进行分析、总结,为轨道交通AFC系统改造工程提供经验。
The Automatic Fare Collection (AFC) of Guangzhou Metro Linel and Line2 (Sanyuanli-Jiangnanxi,Xiaogang-Pazhou) has been operated about a decade, terminals and equipments of some station are unable to supply the demand of the increasing passenger. Tbis article was based on practical AFC improvement project. It provided experiences for the following AFC improvement projects of Metro.
出处
《机电工程技术》
2013年第5期124-128,共5页
Mechanical & Electrical Engineering Technology
关键词
自动售检票
客流增长
改造
出闸机
Automatic Fare Collection
passenger growing
improvement
fare gate