期刊文献+

带压开采陷落柱的精准圈定及注浆加固技术应用 被引量:2

Precise Delineation of Collapse Pillars in Mining under Pressure and Application of Grouting Reinforcement Technology
在线阅读 下载PDF
导出
摘要 团柏煤矿生产时期陷落柱发育,在全区域带压的下组煤不到6 km2的采掘范围内,揭露陷落柱达107个,其中,导含水的有46个,因此在水源的判别、陷落柱的精准圈定以及综合治理方面取得了丰富的经验。以10-215工作面陷落柱的初步圈定、精准探查以及注浆加固杜绝水害发生为主要阐述内容,介绍推广相关防治水技术经验。 During the production period of Tuanbai Coal Mine,collapse pillars developed.Within the mining area of less than 6 km2 of lower group coal with pressure in the whole area,107 collapse pillars were exposed,of which 46 were water diversion ones.Therefore,rich experience had been gained in water source identification,precise delineation of collapse pillars and com-prehensive treatment.Based on the preliminary delineation,precise exploration and grouting reinforcement of collapse pillars in 10-215 working face,this paper mainly expounded the experience of popularizing relevant water control technology.
作者 夏志阳 XIA Zhiyang(Water Control Engineering Technology Branch Company of Yunxia Company,Huozhou Coal Electricity Group of Shanxi,Huozhou 031400,Shanxi,China)
出处 《能源与节能》 2020年第4期142-144,共3页 Energy and Energy Conservation
关键词 带压开采 陷落柱 注浆加固 异常区 mining under pressure collapse pillars grouting reinforcement abnormal area
  • 相关文献

参考文献4

二级参考文献21

共引文献47

同被引文献21

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部