期刊文献+

MT-E50F深水钻井隔水管终端接头研制 被引量:1

Development of MT-E50F Deep-water Drilling Riser Termination Spool
在线阅读 下载PDF
导出
摘要 为满足深水钻井隔水管系统的需要,采用等强度螺栓连接、高压动态密封、高强度厚壁管体全熔透对接焊接等技术,研制了MT-E50F型深水隔水管终端接头,并进行了8896 kN载荷试验、静水压试验和连接互换性试验。试验结果表明,MT-E50F型隔水管终端接头满足深水使用要求和载荷工作要求,密封性能可靠。提出了进一步完成MT-E50F型隔水管终端接头深水水下工业性海试、开展隔水管LMRP系统集成研究和试验等建议。该装置的成功开发对海洋钻井隔水管系统国产化具有一定的参考作用。 In order to meet the needs of deepwater drilling riser systems,MT-E50F deep water drilling riser termination spool was developed by using equal-strength bolted connections,high-pressure dynamic seals,and full-strength butt welding of high-strength thick-walled pipes.This device passed 8896 kN load test,hydrostatic test and connection interchangeability test.The test results show that the MT-E50F riser terminal joint meets the requirements of deep water use and load work,and the sealing performance is reliable.Four suggestions has been proposed for further deep-water industrial test and the lower marine riser package should be developed.
作者 罗强 郭卫华 杨虎 杨红刚 张彩莹 郑万里 张坤 LUO Qiang;GUO Weihua;YANG Hu;YANG Honggang;ZHANG Caiying;ZHENG WanLi;ZHANG Kun(National Engineering Research Center for Oil and Gas Drilling Equipment,Baoji 721002,China;Baoji Oilfield Machinery Co.,Ltd.,Baoji 721002,China;China Oilfield Services Limited,Langfang 065201,China)
出处 《石油矿场机械》 2020年第2期79-82,共4页 Oil Field Equipment
基金 国家高技术研究发展计划(863计划)“深水钻井隔水管系统工程化研制”(2013AA09A222) 工业和信息化部“第七代超深水钻井平台(船)创新专项”(工信部联装〔2016〕24号)。
关键词 隔水管 终端接头 等强度螺栓连接 高压动态密封 全熔透焊接 深水 drilling riser termination spool equal strength bolt connection dynamic seal for high pressure full-penetration weld deep-water
  • 相关文献

参考文献9

二级参考文献55

  • 1李长春,连琏.水下生产系统在海洋石油开发中的应用[J].海洋工程,1995,13(4):25-30. 被引量:30
  • 2王定亚.海洋钻井隔水管国外技术与国产化研究[C]∥深水半潜式平台立管及锚泊技术演习会论文集.天津:[出版者不详],2007.
  • 3黄悦华,任克忍.我国海洋石油钻井平台现状与技术发展分析[J].石油机械,2007,35(9):157-160. 被引量:57
  • 4Bai Y, Bai Q. Subsea engineering handbook [ M ] . [ S. 1. ] : Elsevier, 2012.
  • 5Hansen R L, Rickey W P. Evolution of subsea produc- tion systems: A worldwide overview[J] . Journal of Petroleum Technology, 1995, 47 (8) : 675 -680.
  • 6Bouquier L, Signoret J P, Lopez R. First application of the a/l-electric subsea production system-implementation of a new technology [ C] . Houston, Texas: 2007.
  • 7API Spec 6A. Specification for wellhead and christmas tree equipment [S] . 2000.
  • 8API Spec 17D. Specification for subsea wellhead and christmas tree equipment [S] . 1992.
  • 9API6A ,SPECIFICATION FOR WELLHED ANDCHRISTMASTREEEQUIPMENT[S].2004.
  • 10ShaughnessyJ M,ArmagostW K.ProblemsofUltra-deepwaterDrilling[R].SPE52782,1999.