摘要
在某学校新建项目中,通过利用BIM5D(iTWO软件)技术,将工程BIM三维模型关联工程施工进度和工程成本,结果显示,项目团队利用同一模型进行工程算量和计价工作,将导入的模型自动算量,不仅提高了编制概算、预算的准确性,而且编制概算、预算的时间缩短了30%,节约了工期。利用BIM5D打通模型、成本和进度信息,帮助优化施工组织,加强对施工进程的管控。
The project of Gucun world foreign language school connects the BIM3D model of the project with the construction progress and project cost by using BIM5D(iTWO software)technology. The results show that the project team uses the same model for engineering calculation and valuation. The automatic calculation of the imported model not only improved the accuracy of compiling budget estimates and budgets,but also shortened the time of compiling budget estimates and budgets by 30% and saved the construction period. BIM5D was used to get through the model,cost and schedule information to help optimize the construction organization and strengthen the control of the construction process.
出处
《建筑技术开发》
2019年第21期44-45,共2页
Building Technology Development
关键词
BIM5D
工程算量
工程进度
成本
5D building information model
engineering budgeting
project progress
cost