西藏旁多水利枢纽工程安全监测现状与展望 被引量:3

Present situation and prospect of safety monitoring for Tibet Pangduo Water Project
在线阅读 下载PDF
导出
摘要 针对旁多水利枢纽海拔高、覆盖层深、地震烈度高等复杂地质条件和大坝的结构特点,建立了一套安全监测自动化系统,以保障枢纽工程安全运行。但由于监测项目和仪器设备多,数据庞大,给后期的数据处理分析带来许多困难。建议利用"4S"技术,将现有资源统筹整合开发成"一张图"系统,使工程运行情况一目了然,也便于数据分析和处理。 Considering the complicated geological conditions of high altitude, deep overburden and high seismic intensity of Pangduo Water Project and the structural characteristics of the dam, a safety monitoring automation system has been established to ensure the safe operation of the project. However, due to the large number of monitoring items and instruments and the huge data, it brings many difficulties to the later data processing and analysis. It is suggested that the "4 S" technology be used to integrate the existing resources into a "one map"system, so that the operation of the project can be seen at a glance, and it is also convenient for data analysis and processing.
作者 尹正宇 次仁卓玛 周斌山 卜雷 旦增罗布 段丹 Yin Zhengyu;Ciren Zhuoma;Zhou Binshan;Bu Lei;Danzeng Luobu;Duan Dan
出处 《中国水利》 2019年第14期42-44,共3页 China Water Resources
关键词 旁多水利枢纽 大坝安全 “4S”技术 监测自动化系统 “一张图”系统 Pangduo Water Project dam safety "4S" technology monitoring automation system "one map" system
  • 相关文献

参考文献1

同被引文献45

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部