寒区铁路路基冻害微型盾构靶向置换整治技术 被引量:9

Target Replacement Remediation Technology for Railway Subgrade Frost-heaving by Micro-shield in Cold Region
在线阅读 下载PDF
导出
摘要 以秦沈客运专线为依托,开展了铁路路基冻害微型盾构靶向置换整治技术研究,对微型盾构非开挖方式的整治方案、施工步骤进行了详细介绍,并监控施工过程,分析整治效果。结果表明:该技术直接针对病灶处不良填料进行靶向精准置换,达到了治标治本目的;施工过程中采用基于变形自动监测的信息化动态施工,确保了铁路路基的稳定性与线路的平顺性;秦沈客运专线17个工点的冻害治愈率达94%。铁路路基冻害微型盾构靶向置换整治技术有推广应用价值。 Based on Qinhuangdao-Shenyang passenger dedicated railway target replacement remediation technology for railway subgrade frost heaving by micro shield was carried out.The treatment plan and construction procedure of non excavation by micro shield were introduced in detail.The construction monitoring was conducted and treatment effect was analyzed.The results show that inappropriate fillings can be replaced accurately by this technology and the disease is treated fundamentally.Informational dynamic construction which based on the automatic monitoring of deformation is adopted and ensures the stability of railway subgrade and the smoothness of line.The frost heaving curing rate for 17 sections of Qinhuangdao-Shenyang passenger dedicated railway is 94%.Target replacement remediation technology for railway subgrade frost heaving by micro shield has popularization value.
作者 闫宏业 YAN Hongye(Railway Engineering Research Institute,China Academy of Railway Sciences Group Co.Ltd.,Beijing 100081,China)
出处 《铁道建筑》 北大核心 2019年第6期93-96,共4页 Railway Engineering
基金 中国铁路总公司科技研究开发计划(2017G008-B)
关键词 铁路路基 冻害整治 试验研究 微型盾构 填料换填 Railway subgrade Frost-heaving treatment Experimental study Micro-shield Filling replacement
  • 相关文献

参考文献6

二级参考文献37

  • 1戴惠民,乐鹏飞,王兴隆,陈肖柏,王雅卿.季冻区公路路基土冻胀性的研究[J].中国公路学报,1994,7(2):1-8. 被引量:46
  • 2周小霞.高原多年冻土区铁路建设施工技术管理[J].铁道建筑,2005,45(7):69-71. 被引量:1
  • 3程爱君,叶阳升.多年冻土地区路基冻害分析及防治措施[J].铁道建筑,2006,46(7):60-61. 被引量:17
  • 4温立光.呼和浩特铁路局管内路基冻害整治[J].铁道建筑,2006,46(11):85-86. 被引量:9
  • 5中华人民共和国铁道部.TB10001-2005铁路路基设计规范[S].北京:中国铁道出版社,2005.
  • 6中华人民共和国铁道部.新建时速200~250 km客运专线设计暂行规定(上、下)[S].北京:中国铁道出版社,2005.
  • 7徐学祖,王家澄,张立新.冻土物力学[M].北京:科学出版社,2001.
  • 8HAYHOE H N,BALCHIN D.Field Frost Heave Measurement and Prediction during Periods of Seasonal Frost[J].Canadian Geotechnical Journal,1990,27(3):393-397.
  • 9Clarke E S,Krzewinski T G,Metz M C.The Trans Alaska Pipeline System Synthetically Insulated Workpad:An Evaluation of Present Conditions[C] //Proceedings of the ASME Energy Resources Technology Conference and Exhibition in Houston.Texas:ASME,1981.
  • 10Metz M C,Krzewinski T G,Clarke E S.The Trans Alaska Pipeline System Workpad:An Evaluation of Present Conditions[C] // Proceedings of the 4th Canadian Permafrost Conference.Ottawa:National Research Council of Canada,1982.

共引文献104

同被引文献173

引证文献9

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部