期刊文献+

运营中铁路增设地下水路堑冻害治理措施的研究

Research on Measures for Controlling Frost Damage in Underground Water Cutting Added to Operating Railways
在线阅读 下载PDF
导出
摘要 基于西北季节性冻土地区某运营中高速铁路地下水路堑冻害治理的设计实例,介绍了地下水路堑的冻害情况,研究了其常规治理措施及存在的问题,探讨了治理措施优化方案,比较了边坡形式优化前后的经济效益。结果表明,优化治理措施后,减少了土石方开挖,降低了工程投资,缩短了施工周期,具有良好的经济技术效益。 Based on a design case of frost damage control for a groundwater cutting in an operational high-speed railway in the seasonal permafrost region of Northwest China,this study examines the frost damage conditions of the groundwater cutting,evaluates conventional control measures and their limitations,explores optimized control strategies,and compares the economic benefits before and after slope optimization.The findings indicate that optimizing the control measures has reduced earthwork excavation,lowered project costs,shortened construction time,and demonstrated significant economic and technical benefits.
作者 周浩宁 ZHOU Hao-ning(Inner Mongolia Railway Survey and Design Institute Co.Ltd.,Hohhot 010050,China)
出处 《工程建设与设计》 2025年第14期58-60,共3页 Construction & Design for Engineering
关键词 运营铁路 地下水路堑 路基冻害 operating railway groundwater cutting subgrade frost damage
  • 相关文献

参考文献2

二级参考文献81

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部