摘要
通过研究光伏电站度电成本的基本概念,分析了其主要影响因素;并对度电成本计算方法进行了工程化近似,以便更加直观地将装机规模设计与度电成本紧密关联;对可能出现的各类约束条件进行研究和分析,提出了基于度电成本优化装机规模设计的一般思路,为类似工程的经济性分析和设计提供参考。
The paper analyzes the main influencing factors by studying the basic con. cept of LCOE and approximates the calculation method of the LCOE in engineering, to more directly connect the installed capacity with LCOE. Possible constraints are studied and analyzed and the general idea of optimizing installed scale design based on electricity cost is put forward, providing some reference for economic analysis and design of similar projects.
作者
吴江
李晟
WU Jiang;LI Sheng(MCC Huatian Engineering Technology Co. Ltd.;MCC Huatian Nanjing Electrical Engineering Technology Co. Ltd., Nanjing, Jiangsu 210019, China)
出处
《冶金动力》
2019年第7期16-18,共3页
Metallurgical Power
关键词
度电成本
装机规模
约束条件
优化设计
LCOE
installed capacity
constraining condition