摘要
水平井高含水治理是水驱油田开发中后期面临的主要难题。海上X油田水平井高含水治理措施难度大、费用高,而智能分采管柱卡堵水技术由于其成本低、作业简单、风险小等特点,适合于海上油田进行水平井卡堵水试验。通过分析X油田油井完井方式、目前含水状况、累产油量、储层非均质性和见水时间等因素,确定出X油田"水淹"井剩余油潜力大小及工程条件可实施性,最终筛选出5口具备水平井智能分采管柱卡堵水潜力的试验备选井,并依据1口井的卡堵水实例进行实施效果分析,结果表明利用智能分采管柱进行大段"找水、堵水"现场应用效果较好,值得进一步推广应用,为后期油田"控水、增油"提供技术借鉴。
The main difficulty of water flooding oilfields in the middle and late stages is to treat the high water cut of horizontalwells.In X offshore oilfield,however,the treatment of high water cut is difficult and the cost is high.Water plugging technology basedon intelligent separate-production string are characterized by low cost,convenient operation and low risk,so it is suitable for water pluggingof horizontal wells in offshore oilfields.In this paper,the remaining oil potential of watered out wells in X oilfield and the technicalpracticability of water plugging were determined by analyzing completion mode,current water cut,cumulative oil production,reservoirheterogeneity and water breakthrough time.And finally5candidate wells were selected for water plugging test because of their potentialof water plugging with intelligent separate-production strings.Then,the implementation results of water plugging in one well wereanalyzed.The results show that the intelligent separate-production string is remarkable in water searching&plugging of large sections,should be popularized and applied further.It provides the technical instruction for water control and oil production improvement ofoilfields at the late stage of development.
作者
高智梁
郑旭
任宜伟
邓永祥
潘彬
GAO Zhiliang;ZHENG Xu;REN Yiwei;DENG Yongxiang;PAN Bin(CNOOC Limited Qinhuangdao 32-6 Operating Company, Tianjin 300450, China;CNOOC Limited Caofeidian Operating Company, Tianjin 300450, China;CNOOC EnerTech-Drilling & Production Co., Tianjin 300450, China)
出处
《石油钻采工艺》
CAS
CSCD
北大核心
2017年第1期88-91,共4页
Oil Drilling & Production Technology
关键词
水平井卡堵水
智能分采管柱
完井方式
控水增油
海上油田
water plugging of horizontal well
intelligent separate-production string
well completion mode
water control and oil improvement
offshore oilfield