期刊文献+

聚能水压光面爆破在高原深埋隧道施工中应用 被引量:9

Cumulative Hydraulic Smooth-surface Blasting Technology Applied in Deep-buried Tunnel on Plateau
在线阅读 下载PDF
导出
摘要 概述聚能光面水压爆破技术,成功应用于川藏线拉林铁路11标高原深埋隧道的施工。通过推广应用聚能水压光面爆破新技术,项目部施工进度、成本、安全、质量等有大幅度提高,施工作业队普遍好评,反应该技术的先进性、实用性、科学性,深得施工人员的欢迎。隧道掘进采用聚能光面水压爆破有明显的"三提高一保护"作用,即提高了炸药能量利用率、施工进度及经济效益,同时保护了作业环境,更好的做到了以人为本,社会、环境效益显著。大家一致认为这项新技术在隧道掘进施工中极为实用,可为今后相似工程提供参考。 Cumulative hydraulic smooth-surface blasting technique, which has been successfully appfied in the construction of deep buried tunnel in plateau on the Lot 11 of Nyingchi-Lhasa Railway in Sichuan-Tibet Highway, is summarized in the paper. By promoting this new technology, the schedule, cost, safety, quality and so on of the project department construction have greatly improved and the construction groups have given high praise to it. It' s respond to the advanced, practical and scientific nature of this technology. Meanwhile, it is particularly welcomed by the construction personnel. In the tunnel excavation, the effect of "three raise and one protection" is obvious, which improves the energy utilization rate, construction schedule and economic benefits of the explosive. Moreover, it protects the working environment, better achieves the people- oriented, and the social and environmental benefits are remarkable. Everyone agrees that this new technology is a practical technology of tunnel excavation and it will provide reference for similar projects.
作者 冯爱 东怀正 Feng Ai;Dong Huaizheng(China Railway 17th Bureau Group 5th Engineering Co.Ltd.,Taiyuan Shanxi 030032,China)
出处 《铁道建筑技术》 2018年第8期88-91,共4页 Railway Construction Technology
基金 中国铁建股份有限公司科研开发计划项目(16-C22)
关键词 聚能 水压 爆破 高原 应用 gathering energy water pressure blasting plateau application
  • 相关文献

参考文献7

二级参考文献22

共引文献210

同被引文献90

引证文献9

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部