摘要
结合绥延高速公路长岭山1号隧道进口换拱顺利完成所得施工经验及过程中的跟踪探索,重点阐述特殊地质条件下,黄土隧道初支换拱的施工工艺及具体操作流程和主要注意事项,较好的解决了施工中的诸多难题,诠释了隧道施工以人为本、安全第一的原则,为黄土隧道换拱施工安全提供依据。
Combined with the construction experience obtained from the successful completion of the arch replacement in No. 1 tunnel of Changlingshan of Sui-Yan Expressway and the follow-up exploration in the process of the arch replacement, this paper focuses on the construction process and the specific operation flow and the main operation of the initial support arch replacement for the loess tunnel under special geological conditions. Many problems in the construction have been solved and the principles of people-oriented and safety first in tunnel construction are interpreted, which provided basis for the safety of the construction of the loess tunnel.
作者
张伟
ZHANG Wei(China Railway First Group No.2 Engineering Co.,Ltd.,Tangshan 063004,China)
出处
《价值工程》
2018年第20期141-143,共3页
Value Engineering
关键词
黄土隧道
超前支护
换拱
机械破碎
以人为本
loess tunnel
advanced support
arching
mechanical crushing
people-oriented