综采工作面过上覆集中煤柱时压架事故分析与预防 被引量:4

Analysis and prevention on the support crushing accident when fully-mechanized mining face passing through the concentration coal pillar
在线阅读 下载PDF
导出
摘要 为解决近距离煤层群下层煤综采工作面过上层煤集中煤柱时压架的问题,以神东哈拉沟煤矿22207综采工作面为研究对象,分析其过上层煤采空区集中煤柱期间的动载矿压显现特征,提出了采取工作面调斜、调整周期来压、控制煤机牵引速度和工作面推进速度、控制采高等措施,预防了综采工作面压架事故,保证了矿井安全生产。 In order to solve the support crushing problem when the fully-mechanized mining face in the lower coal seam passing through the concentration coal pillars in the upper coal seam,taking No. 22207 fully-mechanized mining face in Halagou Coal Mine as the research object,the dynamic loading characteristics of mine pressure during the mining face passing through the concentration coal pillars of upper coal seam were analyzed,the measures of adjusting the slope of working face,controlling the periodic weighting,regulating the advancing speed of working face and controlling the mining height were carried out,the support crushing accident of fully-mechanized mining face was prevented and mine safety production was ensured.
出处 《陕西煤炭》 2017年第4期58-60,71,共4页 Shaanxi Coal
关键词 近距离 大采高 集中煤柱 动载矿压 顶板控制 close distance large mining height concentration coal pillar dynamic loading mine pressure roof control
  • 相关文献

参考文献5

二级参考文献30

共引文献956

同被引文献47

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部