摘要
文章阐述了沪东造船厂 2号船台钢珠滑道水下接长的施工工艺的特殊性和施工难度 ,通过科学合理地优化设计方案 ,确保了水下钢结构的安全度和缩短施工周期 ,并经实践检验收到了良好的效果。
The specialty of construction technology and difficulty of underwater lengthening construction of East Shanghai Ship Yard #2 building berth shot slipway are expounded. By adopting optimized design scheme, the safety degree of underwater steel structures was guaranteed and the construction period was shortened. Practice has proved the good construction effect