摘要
由于珠江口港珠澳大桥(包括联络桥)、人工岛及其他重大工程的实施,改变了珠海拱北湾海域潮流与水沙条件,通过珠江河口平面二维模型对拱北湾进行潮汐动力、泥沙淤积进行分析预测,初步提出了拱北湾的整治方案。
Since the Pearl River HZMB ( HongKong - Zhuhai - Macao Bridge), artificial islands and other major projects are construc- ting in the Gongbei Bay, the tidal current and sediment transportation are changed. The paper uses two dimensional hydrodynamic models In evaluate the tidal power and mud sediment conditions. And priliminary regulation scheme has been put torward.
作者
吕文斌
王斌
穆守胜
杨聿
LYU Wenbin WANG Bin MU Shousheng YANG Yu(Pearl River Hydraulic Researeh Institute, Guangzhou 510611. China)
出处
《人民珠江》
2017年第2期30-36,共7页
Pearl River
关键词
水环境
泥沙淤积
换水引流
拱北湾
water envirnnment
sedimentation
changing the waler
Gongbei Bay