期刊文献+

铜坑矿全尾砂结构流体胶结充填实验室试验研究 被引量:7

Laboratory Experimental Study on Full Tailings Cemented Filling with Fluid Structure in Tongkeng Mine
原文传递
导出
摘要 为了有效保护铜坑矿地表工业设施,解决崩落法开采面临的矿石贫化率高等问题,开展了铜坑矿全尾砂结构流体胶结充填实验室试验研究。实验室试验结果表明,铜坑矿全尾砂的基本性质满足高浓度结构流自流输送的要求,胶结充填体28d强度可达2.5 MPa以上,但水泥耗量偏大,建议寻找性价比更优的胶结剂。 In order to effectively protect the industrial facili- ties on the surface of Tongkeng mine, and to reduce the high ore dilution during caving mining, laboratory experimental study on full railings cemented filling with fluid structure was carried out. The test results showed that the basic properties of full tailings in Tongkeng mine was available for the gravity transportation of high-concentration structure fluid. The strength of cemented filling bodies reached over 2.5 MPa in 28 days. However, due to high consumption of cement, it is suggested to find a better cementing agent.
出处 《矿业研究与开发》 CAS 北大核心 2016年第10期59-61,共3页 Mining Research and Development
关键词 全尾砂 结构流体 胶结充填 Full tailings, Fluid structure, Cemented filling
  • 相关文献

参考文献11

二级参考文献69

共引文献192

同被引文献80

引证文献7

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部