摘要
冶金工程一般具有投资大、时间紧、任务急等特点,由于设备投资占比重最大且制作周期最长。结合宣钢工作实际,就设备监制中应注意的问题和相关工作程序进行了探讨。
Metallurgical projects are generally heavily invested, tight scheduled and task urgent; and investment in equipment often accounts for the major part requiring long term fabrication. Issues of attention in supervising equipment manufacturing and related work pro-grams are discussed.
出处
《冶金动力》
2016年第5期64-66,共3页
Metallurgical Power
关键词
冶金工程
机械设备
监制
metallurgical project
machinery equipment