摘要 为使工艺规划与调度集成问题更加符合实际,将不确定加工时间考虑到工艺规划与调度集成问题中,并以三角模糊数表示加工时间,提出一种考虑模糊加工时间的工艺规划与调度集成问题。以最大模糊完工时间最小为目标,对该问题进行建模。提出一种多层编码结构的遗传算法,对该问题进行求解。最后,以实例验证了上述模型的正确性及算法的有效性。 In order to make IPPS problem more accordant with the actual conditions,uncertain processing time was considered into IPPS problem.Processing time was expressed by TFN.An IPPS problem with consideration of fuzzy processing time was proposed.The maximum fuzzy makespan was as the main target which will be minimized.The model was built for the problem and a genetic algorithm(GA)with a multi-layer encoding structure was proposed to solve the problem.Finally,the model and algorithm were proved by an application cases.
机构地区 西安理工大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2015年第24期3348-3355,共8页 China Mechanical Engineering
基金 国家自然科学基金资助项目(61402361) 陕西省教育厅科学研究计划资助项目(14JK1521) 陕西省科学技术研究发展计划资助项目(2012KJXX-34) 西安理工大学青年科技创新团队建设计划资助项目(102-211408)
关键词 工艺规划与调度集成 不确定加工时间 三角模糊数 多层编码结构 遗传算法 integrated process planning and scheduling(IPPS) uncertain processing time triangu-lar fuzzy number(TFN) multi-layer encoding structure genetic algorithm
  • 相关文献

参考文献22

  • 1吕盛坪,乔立红.工艺规划与车间调度及两者集成的研究现状和发展趋势[J].计算机集成制造系统,2014,20(2):290-300. 被引量:23
  • 2高亮,李新宇.工艺规划与车间调度集成研究现状及进展[J].中国机械工程,2011,22(8):1001-1007. 被引量:32
  • 3Zhang Luping, Wong T N. An Object-coding Genet-ic Algorithm for Integrated Process Planning andScheduling[J]. European Journal of Operational Re-search, 2015,244(2) :434-444.
  • 4Li Xinyu,Shao Xinyu,Gao Liang,et al. An EffectiveHybrid Algorithm for Integrated Process Planningand Scheduling [J]. Int. J. Production Economics,2010,126:289-298.
  • 5Li Xinyu,Gao Liang,Shao Xinyu. An Active Learn-ing Genetic Algorithm for Integrated Process Plan-ning and Scheduling[J]. Expert Systems with Ap-plications, 2012,39(8)-.6683-6691.
  • 6Leung C W, Wong T N,Mak K L, et al. IntegratedProcess Planning and Scheduling by an Agent-basedAnt Colony Optimization[J]. Computers Indus-trial Engineering, 2010 ,59 * 166-180.
  • 7吕盛坪,乔立红.工艺规划与车间调度复合式集成模型[J].计算机集成制造系统,2014,20(1):110-120. 被引量:12
  • 8Seker A,Erol S,Botsali R. A Neuro-fuzzy Model fora New Hybrid Integrated Process Planning andScheduling System[J]. Expert Systems with Appli-cations, 2013 ,40(13) : 5341-5351.
  • 9Li Xinyu,Gao Liang, Shao Xinyu. Mathematical Mod-eling and Evolutionary Algorithm- based Approach forIntegrated Process Planning and Scheduling [J]. Com-puters Operations Research,2010,37(4) :656-667.
  • 10Phanden R K, Jain A,Verma R. An Approach forIntegration of Process Planning and Scheduling[J]. International Journal of Computer IntegratedManufacturing, 2013,26(4) : 284-302.