南水北调穿黄隧洞工程盾构换刀加固区降排水方案应用 被引量:2

Application of dewatering and draining plan at shield tool changing reinforcement area in Yellow River penetration tunnel work of South-to-North Water Diversion Project
在线阅读 下载PDF
导出
摘要 南水北调穿黄隧洞工程采用世界先进的泥水加压平衡式盾构施工,掘进至隧洞桩号7+762.80处盾构机刀具磨损严重,需要及时更换。为保证换刀工作能在干旱的基坑中顺利进行,必须进行降排水。本文介绍了降排水方案在该工程中的应用,以期为类似工程提供借鉴经验。 World advanced slurry pressure balanced shield construction is adopted in Yellow River penetration tunnel work of south-to-north water diversion project.Shield machine tool is seriously worn when it is drilled to tunnel pile number 7 +762.80,which should be timely replaced.Dewatering and drainage must be implemented in order to ensure smooth tool changing work in drought foundation pit.In the paper,application of dewatering and drainage plan in the project is introduced,and it is expected that it can provide reference and experience for similar projects.
作者 汪水光
出处 《水利建设与管理》 2015年第11期20-23,共4页 Water Conservancy Construction and Management
关键词 穿黄隧洞 换刀加固区 降排水 Yellow River penetration tunnel tool changing reinforcement area dewatering and drainage
  • 相关文献

参考文献4

二级参考文献5

共引文献340

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部