期刊文献+

山西省小浪底引黄干线土洞段施工方法 被引量:1

Method to Construct Soil Tunnel in Main Line of Xiaolangdi Yellow River Diversion Project of Shanxi Province
在线阅读 下载PDF
导出
摘要 山西省小浪底引黄工程是山西省大水网建设重点项目之一,引水干线隧洞长52.77 km,其中土洞段11.88km,地质条件复杂,施工困难。文中叙述了该隧洞土洞段施工条件,对其开挖及衬砌施工方法(全机械化盾构和人工开挖法)进行分析、比较与探讨。 Xiaolangdi Yellow River Diversion Project is one of the key projects in large water network construction in Shanxi Province.Its main line length of water diversion tunnel is 52.77km.,the length of soil tunnel in which is 11.88 km.Geologic condition of soil tunnel is complex.Its construction is difficult.The article introduces construction condition of this soil tunnel,analyzes and compares this tunnel's excavating and lining methods(including shield machine method and manual construction method).
作者 安静华
出处 《山西水利科技》 2012年第1期23-24,共2页 Shanxi Hydrotechnics
关键词 小浪底引黄 长隧洞 施工技术 Xiaolangdi Yellow River Diversicn project long tunnel constructicn technique
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部