混合梁斜拉桥现浇梁端索道管定位精度控制

On analysis of accuracy control for positioning of cableway tube on cast-in-site girder end for hybrid girder cable-stayed bridge
在线阅读 下载PDF
导出
摘要 结合永川长江大桥南岸边跨现浇箱梁索道管定位的工程实践,从现浇端索道管坐标的计算和修正方面对斜拉桥现浇梁端索道管定位精度控制进行了分析,指出混合梁斜拉桥现浇端索道管的精确定位影响着成桥的斜拉索和线型,对全桥精度控制意义重大。 Combining on the engineering practice of cableway tube positioning on cast-in-site girder for south half of Yongchuan Yangtze River Bridge,the paper analyzes the accuracy control for the positioning of cable on cast-in-site girder end for hybrid girder cable-stayed bridge,and in-dicates the accuracy positioning of the cableways of the bridge can affect the stay cables and its line types of the bridge,so it is important for the accuracy control of the whole bridge.
出处 《山西建筑》 2015年第34期160-161,共2页 Shanxi Architecture
基金 "十二五"国家科技支撑计划课题"钢-混凝土组合结构现代化施工关键技术研究四"(课题编号:2011BAJ09B0404)
关键词 斜拉桥 现浇梁端 索道管 精度控制 stay bridge cast-in-site girder end cableway tube accuracy control
  • 相关文献

参考文献1

  • 1JTG/TF50-2011,公路桥涵施工技术规范[S].

共引文献621

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部