期刊文献+

高强铝合金复杂筋板构件分流开放加载 被引量:6

Study on split-flow open loading of aldural complex rib-web component
原文传递
导出
摘要 针对7075高强铝合金复杂筋板构件成形过程中易产生折叠、充不满及载荷过大等问题,在分析其缺陷产生机理的基础上,提出针对此类复杂筋板构件的分流开放加载成形技术,通过控制分流开放加载高度Hy,使分流开放加载与材料成形之间过渡均匀,可有效降低构件成形载荷并避免因分流开放加载而产生的成形缺陷。在12.5MN数控液压成形设备上进行实验,成功试制出无缺陷的合格零件,成形载荷降低约60%,材料利用率提高了50%以上,且锻件的力学性能满足产品的服役条件。 To solve the defects of 7075 aldural complex rib-web components during forming process, based on the study of defects mechanism, a local-overall coupling loading method is proposed, viz. , controlling the local loading height My to make local loading and the overall loading close transition. The technology can avoid the forming defects and reduce the local loading forming load. The production test in the 12.5 MN numerical control hydropress was carried out. The max forming load is reduce by 60 %, and the material utilization efficiency increased above 50 %. The mechanical property completely meets the service condi tion for final product.
出处 《塑性工程学报》 CAS CSCD 北大核心 2015年第4期26-29,共4页 Journal of Plasticity Engineering
基金 国家973预研资助项目(2012CB626808)
关键词 高强铝合金 复杂筋板构件 V型筋 分流开放加载 aldural complex rib-web components V type rib split-flow open loading
  • 相关文献

参考文献6

二级参考文献13

共引文献25

同被引文献26

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部