期刊文献+

提高变电站基础量测数据时间同步性的方法 被引量:3

Methods for improving time synchronism of substation's basic measuring data
在线阅读 下载PDF
导出
摘要 为了减小变电站端量测数据不同步引起主站状态估计等应用的误差,研究了提高变电站量测数据时间同步性的方法。结合部分500k V高压变电站出现的站内母线功率不平衡现象,分析了变电站基础量测数据时间同步性的主要影响因素,提出若干提高同步性的方法。方法采用基于离散傅里叶变换(DFT)的快速量测算法,量测数据带时标上送,同时设置合理的变化死区提高量测刷新速率,远动装置根据量测时标对齐同一断面数据组包上送。采用RTDS动模仿真试验系统搭建测试环境进行对比试验,试验结果验证了方法的有效性。 In order to reduce the master station state estimation error caused by asynchronous measuring data of sub- station terminal, the methods for improving time synchronism of substation measuring data are researched. According to the partial bus power imbalance phenomenon of some 500kV UHV substation, the main factors which affected time synchronizationof substation basic measuring data are analyzed. Several methods to improve the synchronization of the basic measuring data in substation are proposed. The methods are based on fast measuring algorithm, send the meas- uring data with time stamp, and set suitable changing threshold to improve the refresh rate of measuring data. The re- transmission unit aligned measuring data according to the time stamp and sent it to master station in one packet. A simulation test system is built by using RTDS and several kinds of comparative test are done. The test result proves that the methods are effective.
出处 《电测与仪表》 北大核心 2015年第15期41-45,共5页 Electrical Measurement & Instrumentation
基金 国家自然科学基金资助项目(61233007) 2014年国网总部科技项目"提升智能变电站PMU装置动态性能及就地低频振荡辨识能力的关键技术研究与应用" 电子信息产业发展基金资助项目财建[2013]757号
关键词 变电站 量测数据 时间同步性 母线不平衡 带时标上送 RTDS substation, measuring data, time synchronization, bus power imbalance, send data with timestamp, RTDS
  • 相关文献

参考文献12

二级参考文献95

共引文献257

同被引文献36

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部