摘要
针对目前橡胶坝群蓄水工程水面线计算中存在的问题,以山西省吕凉市山区河道橡胶坝蓄水工程为例,选择了两种典型工况,从理论上总结了推算水面线的方法,可供类似情况下水面线推求参考。
Mountain river rubber dam water accumulation project in Shanxi Lüliang is adopted as an example aiming at problems in current Rubber Dam Group Water Accumulation Project water line calculation.Two typical conditions are selected.Methods of calculating water lines can be summarized theoretically,thereby providing reference for water line calculation under similar condition.
出处
《水利建设与管理》
2015年第4期33-35,7,共4页
Water Conservancy Construction and Management
关键词
山区河道
橡胶坝
蓄水工程
水面线计算
mountain river
rubber dam
water accumulation project
water line calculation