摘要
介绍导洞法的概念及其作用,分析导洞法的特点及其适用条件。以2座已建成运营的单洞双线铁路隧道和1座施工图设计阶段的双洞6车道高速公路隧道共3座地质差异较大的特长隧道为依托,主要进行以工期关键工序——挖掘和初期支护为研究对象的工期方案模拟,并比对模拟方案工期与实际或施工图设计工期。认为:1)软弱破碎围岩比例高的单洞隧道应慎重采取TBM导洞法。2)仅用1台TBM单向导洞法取代工期性辅助导坑对单洞特长隧道而言是不可行的;在单洞特长隧道建设中,2台TBM相向实施TBM导洞法是可行的,但须具备设置辅助导坑的条件,辅助导坑宜按无轨双车道断面设置。3)在双洞特长隧道建设中,双洞各用1台TBM相向平行导洞法则有望取代工期性辅助导坑;双洞特长隧道实施TBM导洞法,在工期、成本(投资)、不良地质应对方面有明显优势。4)川渝地区广泛分布的泥岩、砂岩、砂质泥岩、泥质砂岩及其互层地层具有实施TBM导洞法的天然地质优势。最后对TBM导洞法的应用前景进行了展望。
In this paper,the concept and effect of pilot-heading method are presented,and the characteristics and applicable conditions of pilot-heading method are analyzed. The construction schedules of 3 tunnels located in different geological conditions are simulated in terms of excavation and primary support,and comparison and contrast is made between simulated construction schedules and actual / designed construction schedules. Conclusions drawn are as follows:1) TBM pilot-heading method is not suitable for single-tube tunnels located in soft,weak and fractured strata; 2)Instead of other construction galleries,TBM pilot-heading method may be adopted for single-tube tunnels. 3) Twin TBM pilot-heading method is suitable for twin-tube extra-long tunnels, which has advantages in terms of construction schedule,cost and coping with unfavorable geological conditions; 4) TBM pilot-heading method is suitable for the construction of tunnels in Sichuan and Chongqing area. Finally,the application of TBM pilot-heading method isprospected.
出处
《隧道建设》
北大核心
2015年第2期149-159,共11页
Tunnel Construction
基金
国家科技支撑项目(2012BAG05B03)
关键词
隧道
TBM导洞扩挖法
钻爆法
tunnel
TBM pilot-heading
enlarging method
drilling and blasting method