4Sebastiano Pelizza.Pilot bore excavation with TBM for the design and construction of larger tunnels[J].Tunnelling and Underground Space Technology,1991(6):185-189.
5Barla,G.Lessons Learnt from the Excavation of a Large Diameter TBM Tunnel in Complex Hydrogeological Condi-tions.GeoEng 2000(International Conference on Geotechni-cal & Geological Engineering,Melbourne,November2000).Invited Paper,pp.938-995.Lancaster,Pennsyl-vania.Technomic Publishing.
6Katushi Miura,Hiroshi Yagi,Hiromichi Shiroma,et al.Study on design and construction method for the New Tomei-Meishin expressway tunnels[J].Tunnelling and Underground Space Technology,2003,(18):271-281.
7Katsushi Miura.Design and construction of mountain tunnels in Japan[J].Tunnelling and Underground Space Technology,2003,(18):115-126.
8Jun Sato,Masahiro Nakata,Hutoshi Kustmao-to.Verification of tunnel support and effect of auxiliary method for super large tunnel in squeezing rock Proceedings of ITA-AITES Tunnel Congress 2009:safety tun-neling for the city and for the environment Budapest,Hun-gary,May 23-28,2009,746-748.
9Masahiro Nakata,Tetsuya Yamazaki,Hiroshi Yagi,et al.Considerations regarding results of design and con-struction of tunnels with large cross section in the New Tomei Expressway.Proceedings of ITA-AITES World Tunnel Congress 2009:safety tunneling for the city and for the environment.Budapest,Hungary,May 23-28,2009,733-735.
10S.Maurhofer,M Glattli.Uetliber Tunnel:heading meth-ods and interior works[J].Tunnelling and Underground Space Technology,2004,(19)4-5:349.
10Sebastiano Pelizza. Pilot bore excavation with TBM for the design and construction of larger tunnels [ J ]. Tunnlling and Underground Space Technology, 1991 ( 6 ) : 185 - 189.