大规模风电场在系统暂态过程中的运行实测分析

The Analysis of Large-scale Wind Farm Operation in the Transient Process
在线阅读 下载PDF
导出
摘要 甘肃电网风电装机容量已超过水电,成为第二大能源。风电带来的电网安全稳定运行压力也随之增大。经过近年来对风电机组低电压穿越能力的检测改造,以及对风电场动态无功补偿装置的运行规范,风电场在系统发生大扰动时的稳定运行能力得到了大幅提升。为了检验风电场的抗扰动能力,在酒泉地区开展了人工短路试验,用最接近真实的手段进行了验证分析。 Wind turbine generators now have higher installed capacity than hydropower in Gansu power grid, becoming the second largest energy source. Thus, there is more pressure on the safe and steady grid operation of wind turbine generators. Through years of upgrading of low-voltage ride through capability of wind turbine generators as well as standardization of the operation of the dynamic reactive compensation device of the wind power plant, its steady operation capability has been improved greatly in the case of serious system disturbance. To test the anti-disturbance capability of the wind power plant, an artificial short circuit test is carried out in Jiuquan area, and check analysis is made in the means nearest the reality.
出处 《电气自动化》 2015年第1期58-60,共3页 Electrical Automation
关键词 风电场 风电机组 大扰动 人工短路 直驱 wind power plant wind turbine generator large disturbance artificial short circuit direct drive
  • 相关文献

参考文献12

二级参考文献119

共引文献491

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部