摘要
生产率及人员饱和度的高低直接关系到企业的效益,通过对天窗生产线工艺流程的详细分析,结合生产现场进行了设施规划及生产线的改善,包括改善现场的布置、改善工艺流程;增添快速换模装置、在线打磨机等,应用时间测定的方法测出了改善前后各项参数。结果表明:换模时间较改善前减少80%,工序人员减少2个,平均人员饱和度由55%提高到了80.9%,为企业带来了良好的经济效益。
productivity and personnel saturation is directly related to benefit of enterprise,through a detailed analysis of process of skylight production line,facilities planning and improvement of production line is carried out by combining with the production site,including improving the layout of the site,the process flow;adding fast changeover device,online grinding machines and so on,parameters before and after improvement is measured by using method of time determination. The results show that: changeover time is improved by 80%,operation personnel to reduce 2,the average staff saturation is increased from 55% to 80. 9,it bring good economic benefits for the enterprise.
出处
《组合机床与自动化加工技术》
北大核心
2014年第10期142-144,共3页
Modular Machine Tool & Automatic Manufacturing Technique
关键词
天窗导轨生产线
换模时间
改善
人员饱和度
skylight rail production line
changeover time
improvement
personnel saturation