期刊文献+

对有关既有线提速几个问题的探讨 被引量:4

EXPLORATION ON SEVERAL PROBLEMS CONCERNED WITH RAISING SPEED ON EXISTING RAILWAY LINES
在线阅读 下载PDF
导出
摘要 既有线提速以适应铁路走向市场的需要已成为共识。在既有线提速的勘测设计中 ,应注意区别“达速”与“提速”的概念。达速与提速的最终目标是提高旅行速度 ,缩短旅行时间。为提高旅行速度要采取综合措施并注意处理工程投入与获取效益间的关系 ,注意处理近期实施与长远规划的关系 ,注意处理土建工程改造与移动设备更新的关系 。 Raising speed on existing railway lines to meet the needs of railways facing on the market has become a common programme. During the survey and design for raising speed on existing railway lines, the conceptions of 'up to speed' and 'raising speed' should be taken into attention to distinguish. The final targets of them are to increase the travelling speed and to reduce the travelling time. In ordr to increase the travelling speed, the comprehensive measures should be adopted and the treatment of follwing relations should be taken into attention,such as the relation between investment and benefit of engineering project,between short term installation and long term planning between reconstruction of civil engineering and renewal of portable equipment, between raising speed of passenger trains and freight trains, etc.
作者 陈红念
出处 《铁道工程学报》 EI 2002年第1期4-8,共5页 Journal of Railway Engineering Society
关键词 既有线 提速 铁路 勘测 设计 客车 货车 运行速度 existing railway line raising speed problems exploration
  • 相关文献

同被引文献14

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部