摘要
提出了应用多目标模糊数学优选理论来评价和选择地基处理方案 ,给出了该方法的原理、模型及应用步骤 ,对某工程的地基处理方案评价得出采用水泥搅拌桩法最佳。应用结果表明 :模糊优选理论将地基处理方案选择和评价的主观性转化为数学形式 ,考虑了各评价因素的重要程度 ,将各方案的评价指标量化分析 ,使评价和选择方案更加科学、合理、直观。
Applying the fuzzy optimization theory to evaluate and choose the plans of soil treatment is proposed in this paper.Its principle,model and procedure are given.The application of this method is illustrated with an example.The plan of cement stirrer pile is recommended to be the best way for a certain project in soil treatment.It is showed that the fuzzy optimization theory converts the subjective factors to mathematical forms,and considers the important degree of all kinds of related factors and analyzes their indexes quantitatively.It makes the evaluation and the choice more scientific, reasonable, objective and reliable.
出处
《西部探矿工程》
CAS
2002年第3期21-23,共3页
West-China Exploration Engineering