摘要
文章以吴泾第二发电有限责任公司八期扩建工程 2×6 0 0MW机组“飞灰 /底渣岛”的应用实例为背景 ,通过消化、吸收国外飞灰 /底渣排放系统的特点 ,剖析该系统的设计思想及工艺过程 ,总结该系统应用与改进后成功的经验教训 ,探索计算机控制设计 ,工艺流程国产化设计、制造、应用的新思想、新方法。
Based on the application example of 'Fly Ash/Bottom-slag Island'in the 8th phase 2×600 MW units project of Wujing II Power Plant, through anatomizing the design philosophy and technological process of the imported fly-ash and bottom slag discharge system and assimilating its favorite features, this paper sums up the successful improvement experiences, and searches for computer control design, technical process and the new ideas and methods for nationalized design, manufacture and application.
出处
《河北电力技术》
2002年第2期8-13,共6页
Hebei Electric Power
关键词
电厂
技术改进
600MW大型燃煤机组
飞灰
底渣岛
机电控一体化
fly-ash/bottom-slag island
electric-mechanic-control integration
pneumatic conveying
hydraulic discharge