期刊文献+

600MW大型燃煤机组“飞灰/底渣岛”机电控一体化的应用与改进

Application and Improvement of Electric-mechanic-control Integration for "Fly-ash and Bottom-slag Island"of 600 MW Coal-fired Units
在线阅读 下载PDF
导出
摘要 文章以吴泾第二发电有限责任公司八期扩建工程 2×6 0 0MW机组“飞灰 /底渣岛”的应用实例为背景 ,通过消化、吸收国外飞灰 /底渣排放系统的特点 ,剖析该系统的设计思想及工艺过程 ,总结该系统应用与改进后成功的经验教训 ,探索计算机控制设计 ,工艺流程国产化设计、制造、应用的新思想、新方法。 Based on the application example of 'Fly Ash/Bottom-slag Island'in the 8th phase 2×600 MW units project of Wujing II Power Plant, through anatomizing the design philosophy and technological process of the imported fly-ash and bottom slag discharge system and assimilating its favorite features, this paper sums up the successful improvement experiences, and searches for computer control design, technical process and the new ideas and methods for nationalized design, manufacture and application.
作者 梁国建
出处 《河北电力技术》 2002年第2期8-13,共6页 Hebei Electric Power
关键词 电厂 技术改进 600MW大型燃煤机组 飞灰 底渣岛 机电控一体化 fly-ash/bottom-slag island electric-mechanic-control integration pneumatic conveying hydraulic discharge
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部