深圳地铁邻桩施工及桩基托换数值分析 被引量:1

Adjacent pile construction and numerical analysis for replacement of pile foundation in Shenzhen city metro
在线阅读 下载PDF
导出
摘要 根据深圳地铁一期工程国贸—老街区间的地质资料及设计文件,对方案单洞双层隧洞施工开挖及对基础托换桩的影响,利用有限元对施工期的地表沉降及托换桩水平位移等力学行为进行了模拟和分析,对设计及施工具有参考价值。 According to the geological data and the design document of first stage metro between Guomao and Old street in Shenzhen city, the simulation and the analysis of surface settlement and replacement pile horizontal displacement during the construction are carried out by the tree- dimension nonlinear finite element method for the single tunnel of double layer. It is for reference to design and construction.
出处 《东北水利水电》 2001年第8期10-11,52,共3页 Water Resources & Hydropower of Northeast China
关键词 地下铁道 桩基托换 有限元模拟 深圳 邻桩施工 数值分析 地表沉陷 洞周位移 锚杆受力 单洞双层 replacement of pile foundation finite element simulation shenzhen city metro
  • 相关文献

参考文献2

  • 1I. Yamaguchi, I. Yamazaki and Y. Kiritani. Study of Ground -Tunnel Interactions of Four Shield Tunnels Drien in Close Prox imity in Relation to Design and Construction of Parallel Shield Tunnels [M]. Tunneling and Underground Space Technology,1998, 13(3): 289 -304.
  • 2朱维申,王平.动态规划原理在洞室群施工力学中的应用[J].岩石力学与工程学报,1992,11(4):323-331. 被引量:29

二级参考文献5

  • 1朱维申,1986年
  • 2杨淑清,武汉水利电力学院学报,1986年,73页
  • 3杨奇,1985年
  • 4张有为,动态规划导论,1985年
  • 5俞裕泰,地下工程,1984年,11期,31页

共引文献28

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部