期刊文献+

邻近盾构施工中的桩基托换效果研究 被引量:16

Research on Effect of Pile Foundation Underpinning in Shield Excavation Adjacent to the Pile
原文传递
导出
摘要 以成都地铁1号线盾构近距离穿越某建筑桩基工程为背景,建立有限元模型,研究盾构穿越施工和荷载转移措施对结构及桩基的影响。结果表明:盾构从桩端穿越时,有无采用梁包柱形式的桩基托换措施对隧道结构内力影响较小,但该措施能够有效减小被托换桩的最大沉降和各桩之间的不均匀沉降。桩基托换使距隧道较近的两桩轴力减小,距隧道较远的桩轴力增加,在所有桩体上均产生附加弯矩,但量值较小。建筑结构的最大弯矩发生在距隧道最远处的柱与右跨梁的刚接位置,桩基托换有效减小梁、柱的最大弯矩。监测数据表明,盾构穿越施工对桩基影响较小,桩基托换措施达到预期效果。 Taking shield passing closely through certain building pile foundation in Chengdu metro line 1 for background,this paper discusses the influence of shield excavation and pile foundation underpinning on adjacent pile foundation and structure.The numerical model is established to simulate the response of the construction.The results show that the structural internal force of tunnel changed little whether the pile foundation underpinning in the form of beam wrapping column had been used or not,but this measure can decrease effectively the settlement and uneven settlement of pile foundation.The pile foundation underpinning decreased the axial force of two piles adjacent to the tunnel and increased the axial force of the pile far from the tunnel,and brought the additional moment to all piles,but the value of change of inner stress is relatively small.The maximum bending moment of structure caused by excavating is located at the rigid joint between the bottom right side span beam and the pillar,and the pile foundation underpinning can decreased effectively the maximum bending moment of beam and pillar.The monitoring data show that the construction of sheild tunnel crossing has less influence to the pile and the measure of the pile foundation underpinning has acheived the desired effect.
出处 《地下空间与工程学报》 CSCD 北大核心 2010年第4期803-809,共7页 Chinese Journal of Underground Space and Engineering
关键词 盾构施工 桩基托换 数值模拟 沉降 附加弯矩 shield construction pile foundation underpinning numerical simulation settlement additional moment
  • 相关文献

参考文献12

二级参考文献46

  • 1杨永平,周顺华,庄丽.软土地区地铁盾构区间隧道近接桩基数值分析[J].地下空间与工程学报,2006,2(4):561-565. 被引量:45
  • 2李宁,辛有良,韩?.华盛顿地铁福特—图特站的仿真反分析[J].西安理工大学学报,1996,12(4):324-329. 被引量:16
  • 3李德寅 王邦楣 等.结构模型试验[M].北京:科学技术出版社,1996..
  • 4李永盛,黄海鹰.盾构推进对相邻桩体力学影响的实用计算方法[J].同济大学学报(自然科学版),1997,25(3):274-280. 被引量:59
  • 5JGJ94-94.建筑桩基技术规范[S].[S].,..
  • 6Makarchian. Review of Underpinning Method[ C]. Corfference: International Symposium on Engineering Geology and the Environment, (Athens GRC), 1997.
  • 7Mukaihiroyuki. Large-scale Line Underpinning Work for Trainway[ R]. Kyoto City Subway Tozai Line, Keihan Electric Railway Co. Ltd. Subway, 1992, Number:74.
  • 8Yamada Hiroshi. Design and Construction of Underpinning Method Under Subway Station[ C]. Jiban Kogaku Shinpojiumu Happyo Ronbunshu, 1998.
  • 9桩基工程手册编写委员会,桩基工程手册,1995年
  • 10叶书麟,基础托换技术,1991年

共引文献414

同被引文献102

引证文献16

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部