中放废液沥青固化装置热试验 被引量:1

HOT TEST OF THE BITUMIN SOLIDIFICATION FACILITY FOR INTERMEDIATE LEVEL OF RADWASTE
在线阅读 下载PDF
导出
摘要 原子能院中放废液沥青固化装置采用蒸发予浓缩及双螺杆机混合蒸发处理流程,用本地区产生的中放蒸残液做料液进行了热试验,其中,蒸发器热运行191小时,双螺杆机热运行349小时,共处理中放蒸残液20.5吨,总放射性1.3×10^(11)贝可,得沥青固化产品45桶,主要技术指标基本达到设计要求,装置运行情况良好,产品出料温度控制在170℃以下是安全的。 The hot test of hitumin solidification pilot-scale plant has been demonstrated with evaporator concentrates of 20.5 tons (total activity 1.3 x 10^(11) Bq) arising from the IAE, using the process of pre-concentration prior to feed and then mixed and evaporated in the twin-extruders. The evaporator and twin-extruders have been running for 191 and 349 hours respectively, and 45 drums of bituminized waste forms were obtained. The results obtained show that the main technical index of the pilot plant is able to meet the reqirements of original design. The operation of this system is good and safe while the outlet temperature is controlled below 170℃.
出处 《核科学与工程》 CSCD 北大核心 1989年第1期66-75,7,共10页 Nuclear Science and Engineering
  • 相关文献

参考文献6

  • 1顾连康,1987年
  • 2刘春秀,中放废液沥青固化设施安全评价,1987年
  • 3徐素珍,辐射化学,1986年,2期
  • 4郑瑞堂,原子能科学技术,1984年,3期,289页
  • 5罗上庚,介绍一个沥青化工厂,1981年
  • 6徐远超,核化学与放射化学,1980年,2卷,3期,169页

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部