摘要
为了更好地控制工程造价 ,应把控制工作重点转移到投资决策阶段、设计阶段、估算编制阶段 ,特别要抓住关键的设计阶段 ,正确处理好技术与经济的对立统一关系 ,努力降低工程造价 ,保证工程造价管理目标的实现。
To control project cost potently, the emphases of control work should be transformed to the stages of decision making, designing and budget estimation, especially, the key stage of design should be concerned, the unity in opposition relationship of technology and economy should be dealt with well. Therefore, to realized the management object of project cost,the project cost must be decreased by all efforts.
出处
《山东冶金》
CAS
2001年第4期64-65,共2页
Shandong Metallurgy