摘要
针对煤矿建设项目投资的特点,探讨了煤矿建设项目投资控制的对策,提出应遵循以设计阶段为重点的建设全过程投资控制、实施主动控制、技术与经济相结合进行投资控制三项原则,利用科学管理方法和先进管理手段,合理确定造价,有效控制投资,从而提高煤矿企业的投资效益。
According to the features of the investment for the coal mine construction programs, the paper explores the strategies for the investment control of the coal mine construction programs, points out the three principles for the investment control for the whole-process investment control, the aetive control implementation, and the combination between the technology and economy with the main points for the design stage, adopts the scientific management methods, advanced management measures to have the reasonable costs and control the investment effectively, and improve the investment benefits for the coal mine enterprises.
出处
《山西建筑》
2012年第34期259-260,共2页
Shanxi Architecture
关键词
煤矿建设项目
投资控制
主动控制
技术与经济
coal mine construction program, investment control, active control, technology and economy