摘要
研究了三峡工程施工中的高架门机的回填基础 ,应用随机分析方法对该回填基础的随机影响因素进行了分析 ,提出了回填基础随机沉降的计算模式 。
The back-filled foundation of the High-Level Gate Machine in Three Gorges Project is studied, By using the random analysis method the random effect factors are analyzed, the calculation method for subsidence of back-filled foundation is given, also the analysis method for reliability evaluation of the subsidence is proposed.
出处
《武汉理工大学学报》
EI
CAS
CSCD
2001年第10期71-74,共4页
Journal of Wuhan University of Technology