摘要 综述水电站水击与调压室涌浪随机分析的研究现状、最新进展、需进一步研究的问题与可采用的研究方法。认为水电站水击压力与调压室水位波动过程是以时间为参数的随机过程,对其进行随机分析,对结构可靠度设计尤为重要。目前应对有关影响因素的随机特性进行实地调查与统计分析,并在此基础上建立水击与调压室涌浪随机分析数学模型;针对分项系数极限状态结构设计的要求,采用适宜的随机分析方法(如MonteCarlo数值模拟方法)得出水击压力与调压室涌浪极值的概率分布特性,为结构可靠度分析提供荷载概率依据。 The Purpose,Progress and methods of stochastic analysis on waterhammer and surge at hydropower stations,and the problems which need to be researched further,are presented in this paper.It is considered that the change of waterhammer pressures and surge height with time is a stochastical process.The probability distributions of random variables affecting them should be investigated and analysesed first,and then their stochastical model could be established,and appropriate study methods could be adopted (e.g.,Monee carlo),So that their probability distributions could be obtained and used in risk analysis of structures.
机构地区 河海大学
出处 《水利水电科技进展》 CSCD 1998年第3期7-11,共5页 Advances in Science and Technology of Water Resources
关键词 水电站 水击 调压室涌浪 随机分析 水力学 hydropower station waterhammer surge stochastic analysis synopsis
  • 相关文献

参考文献8

二级参考文献23

  • 1陈惠欣,全国面流消能学术讨论会论文汇编,1987年
  • 2团体著者,全国面流消能学术讨论会论文汇编,1987年
  • 3赵国藩,工程结构可靠度,1984年
  • 4团体著者,1983年
  • 5王正臬,水利水运科学研究,1979年,2期
  • 6黄克中,水利学报,1991年,3期
  • 7Yang C T,Water Resources Res,1971年,7卷,2期,311页
  • 8朱党生,水道港口,1995年,4期
  • 9王木兰,Proceedings of the sixth IAHR International symposium on stochastic hydraulics,1992年
  • 10朱党生,河海大学学报,1992年,1期

共引文献23

同被引文献131

引证文献8

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部