期刊文献+

中条山供水工程取水方案的比选 被引量:2

Comparative Selection of Intake Scheme in Zhongtiaoshan Water Supply Works
在线阅读 下载PDF
导出
摘要 中条山有色金属公司取水口迁建工程是小浪底库区移民的一项大型引水工程 ,其取水口位置选择决定于所选河段的水文泥沙条件、岸边地形条件、工程地质条件 ,以及库水位的升高和降低对泵站运行的影响等因素。通过对抽取地下水方案、库中库方案、水库方案、桥水结合方案等取水方案的分析比较 ,最后确定从黄河关家至安窝河段作为取水口的位置。经过国家计委组织的专家审查 。 ThemovingandbuildingworksofwaterintakeinZhongtiaoshanNonferrousMetalCorporationisalargediver sionworksformigrationintheregionofXiaolangdiReservoir.Inwhichthesiteselectionofwaterintakeisdepended onhydrology ,sediment,banksidelandform ,geologicalconditionofworksinselectedreachesandoperationofpumpstationwithincreasinganddecreasingofreservoirstageetc .Throughanalyzingandcomparingintakeschemessuchaspumpingundergroundwater,aminorreservoirinareservoir,reservoirandbridge watercombinationetc ,Fi nallythesiteofwaterintakefromGuanjiatoAnworeachesintheYellowRiverhasbeendetermined .Throughex perts’examinationorganizedbytheStatePlanningCommission ,itisconsideredthatthesiteofwaterintakehasthe superiorityofintakeconditionandgenerallayoutofworks .
出处 《人民黄河》 CAS 北大核心 2001年第4期6-7,共2页 Yellow River
关键词 取水口 中条山供水工程 引水工程 water intake intake scheme Zhongtiaoshan water supply works
  • 相关文献

同被引文献14

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部