摘要
论述了山西省小浪底引黄工程从小浪底水库取水的可行性,介绍了取水口的设计,取水水位的确定和取水方式的选择,提出了岸边泵车、浮体泵站及岸边固定泵站三种比较方案,经过论述比较,确定采用岸边固定泵站方案。
The paper represents the feasibility to delivery water from Xiaolangdi Reservoir for Xiaolangdi Yellow River Diversion Project,introduces its intake design,determination of diversion water level and selection of water-diversion fashion,puts forward three alternative schemes:pumping vechicle on track along the reservoir's shore slope,pumping pontoon,and fixed pumping house on reservoir shore,through comparision,selects the scheme of fixed pumping house.
出处
《山西水利科技》
2012年第1期25-26,共2页
Shanxi Hydrotechnics
关键词
小浪底引黄工程
取水口
岸边泵车
浮体泵站
岸边固定泵站
Xiaolangdi Yellow River Diversion Project
intake
pumping vechicle
pumping pontoon
fixed pumping house on reservoir shore