期刊文献+

动压影响底板大跨度硐室支护技术 被引量:7

Support Technology of Floor Large-span Chamber Effected by Dynamic Pressure
原文传递
导出
摘要 某矿21采区中部泵房是该采区疏排水的重要硐室,硐室宽度达到6 m以上,属于典型大跨度硐室,断面使用要求较高。以该矿21采区中部泵房为研究对象,采用调查分析、数值模拟、现场试验等方法,重点研究动压影响下底板大跨度硐室支护技术,深入分析动压影响下巷道围岩活动规律,提出了动压影响下大跨度硐室支护技术。 The central pumping station in 21 mining area is an important dewater chamber of the mining area, chamber widths more than 6 m are typical large span and high sectional requirements underground chamber. Taking 21 mining area central pumping stations as the study object, survey analysis, numerical simulation, field trials and field measurement method are used to focus on the dynamic pressure induced floor large span the chamber support technology, and deeply analyze the dynamic pressure patterns, and put forward support technology of floor large - span chamber effected by dynamic pressure.
作者 王绍留
出处 《煤矿安全》 CAS 北大核心 2014年第6期121-123,127,共4页 Safety in Coal Mines
关键词 动压影响 大跨度硐室 数值模拟 支护技术 dynamic pressure impact large span chamber numerical simulation support technology
  • 相关文献

参考文献1

二级参考文献10

共引文献30

同被引文献46

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部