摘要
垃圾渗沥液处理设施的施工,在常用的处理规模下难度较小。但大规模的垃圾渗沥液处理设施,其相关单体施工难度有一定提升。该文介绍了上海老港渗沥液厂施工的难点,对施工过程中采用的高支模支撑体系和其应用效果进行描述,并对所取得的经验进行了总结,给其他行业的施工作业提供了良好的参照依据。
The construction of landfill leachate treatment plant was not quite complicated in common scale. However the difficulty of construction was correspondingly high for large-scale landfill leachate treatment plant. The key point of construction in Shanghai Laogang Leachate Treatment Plant was introduced in this study. The high-supported formwork system was used in the project and its application effect was described in detail. Experiences gained in the process were summed up to provide a reference for the construction work of other industries.
出处
《净水技术》
CAS
2014年第A01期118-120,共3页
Water Purification Technology
关键词
垃圾渗沥液
大规模
高支模支撑体系
landfill leachate
large-scale
high-supported formwork system