摘要 结合河北省三河市垃圾卫生填埋场工程,对垃圾渗沥液处理调节池、污水处理池、提升井结构所涉及的地震作用下的抗震荷载计算、内力计算及长水池无缝、抗裂及防腐蚀设计等问题进行了分析,并提出了相关的设计方法建议和施工中需要注意的问题。 Taking the project of Sanhe Waste Sanitary Landfill Site of Hebei as an example, some problems were analyzed, including calculation of aseismatic load, calculation of internal force, and design of seamless, cracking resistance and anti-corrosion for long pool involved in the structures of regulating tank of waste leachate treatment, sewage treatment pool, and drawing shaft under earthquake actions. The correlative designing suggestions and some problems needing paying attention to in the construction were put forward.
作者 刘俊起
出处 《环境卫生工程》 2012年第2期45-48,共4页 Environmental Sanitation Engineering
关键词 水池结构 抗震设计计算 长水池无缝设计 pool structure calculation of aseismatic design seamless design of long pool
  • 相关文献

参考文献3

  • 1GB50032—2003室外给水排水和燃气热力工程抗震设计规范[S].北京:中国建筑工业出版社,2002.
  • 2CECS138—2002给水排水工程钢筋混凝土水池结构设计规程[S].北京:中国建材工业出版社,2002.
  • 3GB50119-2003混凝土外加剂应用技术规范[S].北京:中国建筑工业出版社,2003.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部