沉管隧道最终接头深基坑开挖与支护施工技术 被引量:1

Joint Construction Technology of Excavation and Supporting of Deep Foundation Excavation in the End of Immersed Tube Tunnel
在线阅读 下载PDF
导出
摘要 天津滨海新区中央大道海河隧道为北方软弱地基条件下首条沉管隧道,最终接头基坑深度为26m,基坑宽度为40.48m,其中坞口宽度为46.4m,长度33.8m,且临近海河,地下水资源丰富。通过最终接头基坑的顺利施工,掌握了水源丰富、高水位、超深基坑等不利条件下基坑的施工技术,为沉管隧道对接施工奠定了基础。 Central Avenue in Haihe River tunnel of Tianjin Binhai New Area is the first immersed tube tunnel in the North China with soft ground condition, the final joint foundation excavation depth is 26m, width is 40.48m, the dock entrance width is 46.4m, the length is 33.8m, and near the Haihe River with rich underground water resources. By smooth construction of final joint foundation under adverse conditions such as abundant water, high water level, ultra deep foundation excavation, it provides the base for the construction of immersed tunnel joint.
作者 尚霞
出处 《施工技术》 CAS 北大核心 2014年第9期120-122,共3页 Construction Technology
关键词 基坑 降水 开挖 支护 监测 foundation excavation dewatering excavation supports monitoring
  • 相关文献

参考文献6

二级参考文献9

共引文献11

同被引文献14

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部