根据人民日报社报刊综合业务楼工程地质及水文地质条件,最终确定采用桩锚支护结构进行深基坑施工。根据施工要求对临近周边建筑物基坑进行了支护处理,介绍了锚杆具体施工方法和工艺流程。并对基坑沉降进行监测,确定沉降监测方法。对沉降监测数据进行分析,最终得出理论分析结果与实际监测数据较为吻合,满足施工要求。
According to the engineering geology and hydrogeology condition of the People' s Daily Integrated Business Building, the support combination method of piles and anchors is determined. For the construction requirement, the support treatments are applied for surrounding buildings, meanwhile, the concrete construction method and process of the anchors are introduced. The monitoring method is obtained to control the foundation excavation settlement. The data by theoretical analysis are agreed with the actual monitoring data very well by the analysis of the settlement monitoring data, and the construction requirement is guaranteed.
出处
《施工技术》
CAS
北大核心
2014年第6期27-29,共3页
Construction Technology
关键词
高层建筑
地基
深基坑
锚杆
沉降
tall buildings
foundations
deep foundation excavation
anchors
settlement