期刊文献+

地下连续墙L型钢筋笼吊装施工工艺 被引量:3

Lifting Construction Technology of L-shaped Reinforced Cage in the Underground Continuous Wall
在线阅读 下载PDF
导出
摘要 钢筋笼的起吊安装是地下连续墙施工中的重点和难点。"一"字型钢筋笼的吊装施工技术已日趋成熟,而如何快速保质并安全地完成"L"型等异型钢筋笼的吊装施工,需要一套科学的施工技术方可达到预期的效果。为此,针对地下连续墙L型钢筋笼的特点对现有的施工工艺进行优化,确保了钢筋笼吊装满足施工要求。 It is important and difficult to lift and install the reinforcement cage in the construction of underground continuous wall. The lifting construction technology has been mature for the reinforcing cage of " 一" shape. In order to achieve the desired effect, a set of scientific construction technologies are required for the L-shaped steel cage in the quickly lifting construction with good and safe quality. Therefore, our company for this project the characteristics of the underground continuous wall L reinforcing cage optimize the existing construction technology. Against the L-shaped steel cage characteristics of underground continuous wall, the existing construction techniques are optimized to ensure the hoisting construction of reinforcement cage satisfying the requirements
作者 张跃
出处 《广州建筑》 2014年第1期25-28,共4页 GUANGZHOU ARCHITECTURE
关键词 地下连续墙 L型钢筋笼 吊装施工技术 underground continuous wall L-shaped reinforced cage lifting construction technology
  • 相关文献

参考文献4

二级参考文献13

共引文献55

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部