摘要
本文根据异型地下连续墙施工技术的特点,并结合工程实例,对施工准备、测量、挖槽、钢筋笼吊装、混凝土浇筑到成墙各个施工步骤进行了详细阐述,对施工中的质量控制措施和应急处理措施作了扼要介绍。
According to the characteristic of the construction technology of special-shaped underground continuous wall, this article elaborated each step from construction preparation, survey, dredging, erection of reinforcement cage, concrete casting to wall forming, further briefly introduced the quality control measures and emergency treatment methods.
出处
《重庆建筑》
2008年第2期10-12,共3页
Chongqing Architecture
关键词
异型连续墙
泥浆护壁
挖槽
混凝土浇筑
special-shaped underground continuous wall
mud protection
dredging
concrete casting