期刊文献+

墩柱充填下工作面过空巷工业性试验 被引量:2

Industrial Testing on Working Face Passing Abandoned Roadway Under Pier Column Filling
原文传递
导出
摘要 在回收煤柱时,工作面要横过煤柱中的众多空巷,由于超前支承应力的作用,工作面很难通过空巷;通过分析不同墩柱充填条件下空巷顶板岩层的力学状态的变化,同时使用UDEC数值软件模拟了不同墩柱充填条件,工作面横推过空巷的整个过程,分析了过程中空巷围岩顶板的下沉和两帮的变形。在工程实践中,使用墩柱充填了某煤矿的上下山保护煤柱的联络巷,使工作面安全的推过了此联络巷。 When coal mine collects coal pillars, working face must pass the abandoned roadways in coal pillars. Due to the role of ad- vanced abutment stress, it is difficult to pass abandoned roadway for working face. Through the analysis of mechanical state changes at abandoned roadway roof with different pier column filling schemes. UDEC software is used to simulate the whole process of working face passing abandoned roadway with different filling conditions. The article analyzes subsidence and two wall deformation of abandoned roadway in the process, and working face safely passes the abandoned roadway.
出处 《煤矿安全》 CAS 北大核心 2014年第3期46-49,共4页 Safety in Coal Mines
关键词 工作面过空巷 墩柱充填 UDEC模拟分析 支承应力 working face passing abandoned roadway pier column filling UDEC simulation analysis abutment stress
  • 相关文献

参考文献10

二级参考文献53

共引文献961

同被引文献29

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部