期刊文献+

“一罐制”铁水调度优化模型的研究 被引量:7

Research on Scheduling Optimization Model of Hot Metal Can of System
在线阅读 下载PDF
导出
摘要 铁水转运是钢铁生产的一个关键衔接环节,对控制钢铁生产节奏、保证产品质量起着极其重要的作用。钢铁生产新工艺的"一罐制"铁水运输,缩短了钢铁界面流程,使生产的刚性和连贯性增强,对铁水转运系统的要求更高,因此钢铁企业日益重视对铁水转运调度的研究。在对行车起重机+铁水车"一罐制"铁水转运和调度的研究基础上,分析了新工艺流程中铁水转运系统的特点,对钢铁生产的调度计划进行优化,建立了基于"一罐制"铁水转运多目标径路优化模型,并给出了模型算法。算法实现了新工艺下铁水物流运输的智能优化调度,使铁水运输趋于准点,降低生产能耗。 The transport of molten iron is a critical part of steel production and an important mean to ensure steel product quality. It is the crumple zone between the ironworks and steelworks and plays a crucial role to control the rhythm of the transport of molten iron. With the applications of "hot metal can of system" transport, the steel interface process is short- ened, the rigidity and consistency of firm production are reinforced, and it demands a higher level of the molten steel trans- port system. So the iron and steel enterprises have begun to pay more attention on scheduling research of molten iron trans- port. Based on the scheduling research of crane and iron ladle of hot metal can of system, the characteristics of the system are analysed, then the operation plan of steel production is optimized and the scheduling optimization model based on hot metal can of system is established, finally, an algorithm of the model is obtained. The algorithm achieves the intelligent optimiza- tion scheduling of hot metal transport under the new technical process, which leads the iron and steel production tend to be on time and reduces the production energy consumption.
作者 范波 蔡乐才
出处 《四川理工学院学报(自然科学版)》 CAS 2014年第1期49-52,共4页 Journal of Sichuan University of Science & Engineering(Natural Science Edition)
基金 四川省科技厅青年科技创新团队基金(2012Z068) 四川理工学院研究生创新基金(y2013017)
关键词 一罐制 铁水运输调度 优化模型 hot metal can of system hot melt transport and dispatch optimization model
  • 相关文献

参考文献8

  • 1崔建江,罗首章,刘峰,徐心和.铁水运输仿真系统的设计与实现[J].系统仿真学报,2003,15(12):1799-1802. 被引量:12
  • 2Kuzuoglu M,Mittm R.Frequency dependence of the con- stitutive parameters of causal perfectly matched anisotropic absorbers[J].IEEE Microwave Guided Wave Lett(S1051-8207),1996,9(6):447-449.
  • 3黄辉,柴天佑,郑秉霖,李子阳,许雯,周维.铁水调度仿真系统的设计与实现[J].系统仿真学报,2012,24(6):1192-1199. 被引量:6
  • 4Wang Feng,Liu Yuan,Xu Anjun, et al.Modeling and cal-culation for the molten iron preparation problem based on production scheduling of steelmaking area [ C ]//Jiang Y,Chen X G.Proceedings of the 2nd International Con- ference on Modeling and simulation, Liverpool, July 13- 16,2009:308-313.
  • 5叶薇,邹忠平,苏莉,林西平,张勇.重钢铁水运输“一罐制”工艺设计[J].炼铁,2012,31(2):21-24. 被引量:14
  • 6蒋国璋,孔建益,李公法,等.钢铁流程生产调度模型及其仿真研究[C]//Proceedingsofthe29thChineseControlConference,Beijing,luly29-312010:5319-5323.
  • 7Tang Lixin,Wang Gongshu,Liu Jiyin.A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry[J]. Computers & Operations Research,2007,34(10):308 -303.
  • 8黄辉,柴天佑,郑秉霖,罗小川,张红.面向铁钢对应的两级案例推理铁水动态调度系统[J].化工学报,2010,61(8):2021-2029. 被引量:9

二级参考文献28

  • 1Wang Gongshu, Tang Lixin. A locomotive scheduling problem column generation for in molten iron transportation//Proceedings of the IEEE International Conference on Automation and Logistics. New York.. IEEE Computer Society, 2007:2227-2233.
  • 2Tang Lixin, Wang Gongsu, Liu Jiyin. A branch-and price algorithm to solve the molten iron allocation problem in iron and steel industry. Computers & Operations Research, 2007, 34 (10): 3001-3015.
  • 3Kalyan M G, All R M. Empirical evaluation of retrieval in case-based reasoning system using modified cosine matching function. IEEE Transaction on Systems, Mans and Cybernetics Systems and Humans, 1997, 127 ( 6 ) : 601-612.
  • 4Yoon J P, Kerschberg L. A framework for knowledge discovery and evolution in databases. IEEE Transactions on Knozvledgeand Data Engineering, 1993, 5 (6): 973-979.
  • 5Waston I. An introduction to case based reasoning//First United Kingdom Workshop. Proceedings of Progress in Case Based Reasoning. Berlin: Springer Verlag, 1995:3- 16.
  • 6Du Hong, Lin Grier C L. Development of an automated flexible fixture for planar objects. Robotics and Computer- Integrated Manufacturing, 1998, 14 (3) : 173- 183.
  • 7Yuh F D L, Sew B F, Shee E J K. An integrated case-based reasoning approach for intelligent help desk fault management. Expert Systems with Applications, 1997, 13 (4): 265- 274.
  • 8Chai T Y, Liu J X, Ding J L, Su C Y. Hybrid intelligent optimising control for high-intensity magnetic separating proeess of hematite ore. Institution of Measurement and Control, 2007, 40 (6): 171 -175.
  • 9Angi V. How to solve complex problems with cases. Engineering Application Artificial Intelligence, 1996, 9 (4): 377-384.
  • 10Lin Z C, Huang J C. The fixture planning of modular fixtures for measurement. Institute of Industrial Engineers, 2000, 32 (4) : 345-359.

共引文献33

同被引文献44

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部